Indian Bible College

West Wall
West WallWest Wall Exterior- Cedar Ave EntryExterior- Cedar Ave Entry Confrence RoomConfrence Room Cedar Ave EntryCedar Ave Entry Campus EntryCampus Entry
At-a-glance:
Project location: Flagstaff, AZ
Size: 1,680 sf
Date completed: 2019

An underused existing building on the Indian Bible College campus, the remodel rehabilitates a dilapidated space into a library and student center, creating a more accessible, student centered, space.


Jumpstart Preschool

(Sorry, no pictures for this project were found)
At-a-glance:
Project location: Mesa, AZ
Date completed: 2011

Drawings and code reviews to help certify an existing preschool for re-opening under a new owner


Animas Valley Elementary School

Entrance to the school
Entrance to the schoolEntrance to the school
At-a-glance:
Project location: Colorado
Size: 44,000 square feet
Date completed: 1996

• 44,000 sf elementary school

• $2,200,000 budget

• 850 students

• Design/Bid/Build project


A co-design Design/Bid/Build project, together with R. Michael Bell, this was a new school facility in the rural Animas Valley area near Durango.


It was a single-story masonry building design with a wood-frame roof system and a metal roof.


As a K-6 elementary school, it provides classrooms for 850 students, together with assocated administrative space, cafeteria, administrative space, and open recreation areas.


The project budget was $2,200,000, with only one no-cost change order.


Construction time was 9 months.


Northwest Christian Academy

NWCA interior during construction
NWCA interior during constructionNWCA interior during construction NWCA-PureheartNWCA-Pureheart
At-a-glance:
Project location: Phoenix, AZ
Date completed: 1994,95,99

Master plan with remodel and additions for gymansium and classrooms at church school.


Gompers Center for the Handicapped

Front entrance
Front entranceFront entrance Vocational training spaceVocational training space Adjacent to the parking lotAdjacent to the parking lot
At-a-glance:
Project location: Phoenix, AZ
Size: 26,800 square feet
Date completed: 2005

New 26,800 sf Addition to existing 26,700 sf building. Also new 2800 sf basement.

New area includes Kitchen and Cafeteria, Classrooms, Workshops, Gymasium, Pool and Locker Facilities. Basement contains maintenance areas and pool equipment. Masonry construction with wood truss roof. All areas are ADA compliant. Pool is equipped with ramp and spa area for therapy.


Sechrist Dorm

Entrance
EntranceEntrance View from the streetView from the street
At-a-glance:
Project location: Flagstaff, AZ
Size: 4,000 square feet
Date completed: 1998

Addition of a new student activity room, classroom space and offices at the existing Sechrist Dormitory on the campus of Northern Arizona University


Flagstaff and Page Accommodation Schools

Typical exterior near the end of construction
Typical exterior near the end of constructionTypical exterior near the end of construction
At-a-glance:
Project location: Flagstaff and Page, AZ
Size: 2004
Date completed: 1999

New 17,000sf accommodation high schools for Coconino County Accommodation School District.


New buildings of masonry and metal frames with metal roofs, the interior spaces were designed to be flexible enough to provide space for many functions, from High School classes to day care facilities.


All content Copyright © 2024 by RAR Architects. All rights reserved.

Formerly known as Reece Angell Rowe Architects